Linkobiz

Articles / Manufacturing

Reducing waste in a small production run

Start with a record of where materials and time are lost.

Track rejects and rework separately for one production run. Check whether losses cluster around a supplier, a machine or a changeover. Test one adjustment and measure the next run.